Skip to content
101ed home
  • Owner builder
  • White Card
  • Guides
  • Pricing
  • FAQ
1800 101 001Start now
Call 1800 101 001
  • QLD Owner Builder Course
  • White Card NSW (CPCWHS1001)
  • Book a White Card session
  • Guides
  • Pricing
  • FAQ
  • Contact

Call 1800 101 001 · 8am – Midnight AEST, 7 days a week

101ed

101 Education Pty Ltd (ABN 32 161 218 248) is a Registered Training Organisation (RTO 41283).

1800 101 001

8am – Midnight AEST, 7 days a week

Courses

  • QLD Owner Builder Course
  • White Card NSW (CPCWHS1001)
  • Book a White Card session
  • Pricing
  • How it works

Company

  • About us
  • Owner builder guides
  • Contact us
  • FAQ

Policies

  • Privacy policy
  • Refund policy
  • Terms & conditions
  • Complaints & appeals
  • Copyright
  • Safety

© 2026 101ed. All rights reserved. RTO 41283.

[email protected]
  1. Home/
  2. Guides/
  3. Owner building a shed or granny flat in Queensland

Owner building a shed or granny flat in Queensland

Updated 24 September 2026

Short answer

A residential shed, garage, carport or granny flat is owner builder work, so you need a QBCC permit if the finished project is worth more than $11,000 including GST at trade prices. Council building approval and licensed plumbing, gas and electrical trades are required whatever the value.

Sheds, carports and garages

QBCC lists garages, carports and residential sheds as owner builder work. The permit test is the same as for any other project: if the whole job is worth more than $11,000 including GST at trade prices, you need a permit before you start.

A kit shed is a common trap. QBCC counts the slab, the erection labour at what a licensed contractor would charge, any electrical fit-out and the site work, all at trade prices. A $7,000 kit on a concrete slab with power connected is usually over the threshold once it is valued that way.

Granny flats and secondary dwellings

A granny flat, or secondary dwelling, is a residential building on the same lot as your house, so it can be built under an owner builder permit. Because it needs a slab, frame, roof, wet areas, plumbing and electrical, it is almost always well over $11,000, so plan on a permit.

Check with your council first whether a secondary dwelling is allowed on your lot and what size and setback limits apply. QBCC will not issue a permit for multiple dwellings or units, so if your plan is really a second, separately titled dwelling, ask QBCC first.

Council approval and the QBCC permit are different things

You will usually need both. They come from different bodies and neither replaces the other.

  • Building approval comes from a private certifier or your council and checks the design against the building code and planning scheme. Some small structures are exempt; ask your certifier.
  • The owner builder permit comes from QBCC and confirms you may carry out or coordinate the work without a contractor licence.
  • QBCC says you must have council approval and certifier sign-off before you start, including earthworks, and you cannot start until the permit is issued either.
  • Once work starts you must display a weatherproof owner builder sign visible from the street, at least 0.5 square metres with 50 millimetre letters showing the permit number.

Work you must still give to licensed trades

A permit lets you do the building work, not the licensed occupations. For a shed that may only be the electrician; for a granny flat it is most of the services.

  • Plumbing and drainage, including the sewer or septic connection, must be done by a QBCC-licensed plumber or drainer.
  • Gasfitting must be done by a licensed gasfitter.
  • Electrical work must be done by a licensed electrician under Queensland electrical safety laws.
  • Termite management systems must be installed by a licensed contractor.
  • Fire protection or mechanical services work over $1,100 must be licensed.

Do you need a White Card?

The owner builder permit and the White Card are different credentials. QBCC does not require a White Card for the permit. Whether you personally need general construction induction training for work on your own land depends on Queensland work health and safety law; check with Workplace Health and Safety Queensland. Any worker you employ or contractor you engage will already hold one.

Frequently asked questions

  • No. QBCC values the finished project at trade prices, including the slab, the labour to erect it and any electrical work, even if you do the labour yourself.

  • Only if it is worth more than $11,000 at trade prices. A small prefabricated shed usually is not, but check whether council building approval applies.

  • Whether a secondary dwelling can be rented to people outside your household is a council planning question, not a QBCC one. Check your local planning scheme before you build.

  • QBCC usually issues one permit every six years. Describe all the work you intend to do in one application rather than applying twice.

Sources

  • QBCC — About Owner-building
  • QBCC — Responsibilities of an Owner-builder
  • QBCC — Required courses for Owner-builders
  • QBCC — Apply for an Owner-builder permit

This guide is general information, not legal advice. Fees and processing times are QBCC’s published figures at the date above and are reviewed by QBCC each 1 July.